[Construction Case] Slab Foundation House: Settlement Correction Work (Tokyo)
No need for large-scale demolition work! Here is an example of correcting a settlement of up to 95mm in just two days of construction.
We would like to introduce a case of "settlement repair work" carried out on a slab foundation house located in Hachioji City, Tokyo. Due to a maximum settlement of 95mm observed, polyurethane resin was injected under the slab foundation to implement the settlement correction. If you are troubled by the tilting of your slab foundation house caused by earthquakes, liquefaction, or ground subsidence, please feel free to contact us. 【Case Overview】 ■ Construction Area: Approximately 43m2 ■ Maximum Settlement: 95mm ■ Area: Hachioji City, Tokyo ■ Construction Period: 2 days *For more details, please refer to the PDF materials or feel free to contact us.